Services

Hardware design, from schematic to production handover.

Lance Systems is a hardware engineering lab. We design boards, validate the physics, prototype the first units, and hand over production-ready packages. Fixed scope, written acceptance criteria, and documentation that lets a second engineer pick the work up without us.

  • 01

    Hardware architecture and requirements

    Requirements capture, interface definition, partitioning between board and firmware, and the trade studies behind those choices. Delivered as a documented decision record, so the reasons survive everyone who was not in the room.

  • 02

    PCB design and schematic capture

    Multi-layer and HDI layout, high-speed and RF routing, stackup definition, impedance control and constraint-driven design. Fabrication outputs are released as a complete package: Gerber, drill, netlist, BOM and stackup notes.

  • 03

    Power and signal integrity

    Power delivery networks, rail topology, decoupling strategy, return paths and crosstalk analysis on high-speed nets. Backed by simulation and by measurement on the first prototype, not by a rule of thumb.

  • 04

    RF and antenna design

    Transceiver and PA design, matching networks, reference design, antenna design and layout, and the RF test bench to verify them. Includes conducted and radiated measurement, not only simulation.

  • 05

    Mechanical and enclosure design

    CAD, enclosures, heat sinks and thermal management, tolerances and stackup analysis across the mechanical and electrical interfaces, plus the manufacturing drawings that follow from them.

  • 06

    Prototype and validation

    Build-and-measure cycles against a stated requirement. Test equipment is part of the deliverable, not something improvised at the bench.

  • 07

    Prototype sourcing and assembly

    Quotes from vetted fab and assembly partners, consignment and turnkey handled either way, SMT and through-hole, conformal coating and box build. First articles are inspected against the drawings before they ship.

  • 08

    Test engineering and verification

    Test plans, fixture and jig design, functional test, boundary scan, AOI and ICT integration, programming and calibration. A test strategy designed alongside the hardware reduces risk and cost for follow-on units.

  • 09

    Firmware and board support

    Bootloaders, peripheral drivers, board bring-up firmware, and production test firmware. Written to be read by the team that owns the product after us, not only by the person who wrote it.

  • 10

    EMC and compliance

    Pre-compliance testing and design-for-emc work against CE, UKCA, FCC and RED, plus RoHS and REACH documentation. We are involved before the first chamber booking rather than after a failure, because that is the only point where the fix is still a PCB change.

  • 11

    Production transition

    EVT, DVT and PVT. Design for manufacturing and design for test are folded in from the schematic rather than retrofitted, and the transition is measured against the same acceptance criteria as the prototype.

  • 12

    Design documentation and data handover

    Schematics, layout, and the manufacturing data that has to travel with them: ODB++ or IPC-2581, pick-and-place, assembly drawings, panelisation, test coverage and a written bring-up procedure for the first board.

Capability index

The whole signal path, in the terms the discipline actually uses.

PCB design

  • Schematic capture
  • Multi-layer layout
  • HDI
  • High-speed routing
  • Stackup definition
  • Impedance control
  • Constraint-driven design
  • Panelisation
  • Gerber
  • ODB++
  • IPC-2581
  • Design for manufacturing

Integrity and RF

  • Signal integrity
  • Power integrity
  • Return paths
  • Decoupling strategy
  • Crosstalk
  • EMI and EMC
  • Antenna design
  • Matching networks
  • RF layout
  • Shielding
  • Conducted emissions
  • Radiated emissions

Build and test

  • Prototype sourcing
  • SMT assembly
  • Through-hole
  • Box build
  • Conformal coating
  • Bring-up
  • Test fixtures
  • Functional test
  • Boundary scan
  • AOI
  • ICT
  • Test coverage

Production and compliance

  • EVT
  • DVT
  • PVT
  • Design for test
  • BOM and AVL
  • Component sourcing
  • Obsolescence management
  • Supply chain
  • CE marking
  • UKCA
  • FCC
  • RED and RoHS

Engagement

How work is scoped

Every engagement starts with a scoping call and a written statement of work: what is being built, what interface it has to meet, what the acceptance criteria are, and what is explicitly out of scope. Nothing is committed to a production schedule until the first prototype has been measured.

We take on the whole signal path rather than the routing of one block. A schematic handed over without the stackup, the constraint set and the test plan behind it is a drawing, not a design, and it is where most hardware programmes quietly lose their schedule.

Before you get in touch

What does a typical engagement include?
A scoping call and a written statement of work covering what is being built, the interface it has to meet, the acceptance criteria, and what is explicitly out of scope. Nothing is committed to a production schedule until the first prototype has been measured.
Do you take on part of a design, or the whole signal path?
The whole signal path rather than the routing of one block. A schematic handed over without the stackup, the constraint set and the test plan behind it is a drawing rather than a design.
Which design and manufacturing data do you deliver?
Gerber, drill, netlist, BOM and stackup notes, plus ODB++ or IPC-2581, pick-and-place, assembly drawings and panelisation files, together with a written bring-up procedure for the first board.
How does a prototype become a repeatable production build?
Quotes from vetted fabrication and assembly partners, then an EVT, DVT and PVT transition with design-for-manufacturing and design-for-test folded in from the schematic. The transition is measured against the same acceptance criteria as the prototype, and the handover includes ODB++ or IPC-2581, pick-and-place, assembly drawings, panelisation and a written bring-up procedure so the next engineer can pick the work up without us.
Which compliance regimes do you work against?
CE, UKCA, FCC and RED, with RoHS and REACH documentation, starting before the first chamber booking rather than after a failure.
Discuss a design

The first call is a scoping conversation about the board.